BRM BUILD · REPAIR
MAINTAIN

COLCHESTER · ESSEX · COMMERCIAL & RESIDENTIAL

BUILD. REPAIR.
MAINTAIN.
DONE PROPERLY.

One trusted contractor for plumbing, drainage, electrics, building work and full unit refurbishments — with every job photographed, logged and signed off.

5+Years on site, documented
1,000sof jobs completed & logged
6Trades under one roof
100%Photographed before & after

WHAT WE DO

SERVICES

01

PLUMBING & HEATING

Leak tracing and repair, toilets and cisterns rebuilt, taps, sinks and water heaters installed, radiators, valves and heating systems tested and fixed.

02

DRAINAGE & GROUNDWORKS

Soakaways designed and built, drain runs laid, pumped drainage chambers, gullies and gutters cleared, car parks resurfaced, concrete slabs and pads poured.

03

ELECTRICS

Sockets, switches and consumer-unit tidy-ups, LED and security lighting installed, fault finding, rewires of workshop and unit circuits.

04

BUILDING & ROOFING

Partition walls, plasterboarding and insulation, staircases rebuilt, roller and personnel doors fitted, roof leaks traced, patched, felted and sealed.

05

PAINTING & DECORATING

Interior and exterior redecoration, mould treatment, floor painting with industrial polyurethane systems, cladding, containers and steelwork refreshed.

06

COMMERCIAL & RESTAURANTS

Full industrial unit and office refurbishments, restaurant maintenance and equipment moves, landlord works, units brought back to lettable standard.

PROOF, NOT PROMISES

OUR WORK

Industrial unit before refurbishment
BEFORE
Industrial unit after full refurbishment — painted walls and floor, new lighting
AFTER

FULL UNIT REFURBISHMENT — ORCHARD BUSINESS UNITS

Complete strip-out and refit: new stud wall, roller and personnel doors, rewired ring main and lighting, 8 new strip lights, walls and 50L of polyurethane floor paint, sealed ceiling insulation. Ready to let.

New roller shutter door and personnel door on industrial unit

NEW ROLLER & PERSONNEL DOORS

New shutter, rebuilt surround and re-routed wiring on the same unit — weathertight and secure.

New LED strip lighting and sealed insulated ceiling in industrial unit

LIGHTING & INSULATED CEILING

Sealed and taped ceiling insulation with new high-output LED strips — over 500 lumens per m².

Unit basement before conversion
BEFORE
Unit after conversion — painted, boarded, new sockets
AFTER

UNIT CONVERSION — WALLS, FLOOR & ELECTRICS

Fireboarded ceiling, self-levelled and painted floor, new lights, switches and double sockets throughout.

Workshop before clearance and refurbishment
BEFORE
Workshop floor degreased and painted with polyurethane floor paint
AFTER

WORKSHOP FLOOR RESTORATION

Floor scraped, degreased and hole-filled, ceiling gaps sealed, walls cleaned and painted, finished with industrial polyurethane floor paint.

Newly built steel-clad industrial unit with roller door

NEW-BUILD STORAGE UNIT

Steel-clad unit completed from groundworks to handover — cladding, doors, power, water and drainage.

Restaurant interior with repaired LED panels and pendant lighting

RESTAURANT MAINTENANCE

LED panels and spotlights repaired, glasswasher plumbed in, walls repaired — done around trading hours.

Restaurant customer area before repair
BEFORE
Restaurant customer area repaired and repainted
AFTER

RESTAURANT BATHROOM AREA REPAIR

Damaged walls made good and repainted, new PIR LED lighting fitted, leak traced and sealed.

Refurbished office ready for new tenant

OFFICE REFRESH & HANDOVER

Painted, cleaned and snagged — office ready for the next tenant with minimal void period.

Leaking toilet connections before repair
BEFORE
Rebuilt toilet with new flush pipe, seals and waste connector
AFTER

LEAKING TOILET REBUILT

Leaked in three places for years. New flush pipe, seals, waste connector and extension — fixed and dry.

Water heater installation with new copper pipework

WATER HEATER & PIPEWORK

Point-of-use water heater with new copper and MDPE pipework, isolation valves and sink connection.

Stainless steel sink installed in industrial unit

SINK, TAP & WASTE INSTALL

Stainless catering sink with new tap, water meter and waste connection for an incoming tenant.

Commercial toilet repaired and refitted

COMMERCIAL WC REPAIR

Site toilets kept working — valves, seals, handles and locks replaced across the estate.

New radiator valve fitted, system tested

RADIATORS & HEATING REPAIRS

Leaking valves replaced, systems topped up, bled and tested — no leaks, heating back on.

Finished soakaway with new inspection chamber and resurfaced access

SOAKAWAY & DRAINAGE RUN

120 metres of pipe laid, 1.5 m-deep soakaways built, inspection chamber cast and area resurfaced.

Pumped drainage chamber with float switch and filtered outlets

PUMPED DRAINAGE CHAMBER

Custom pump chamber taking four drain runs — automatic level control stops yard flooding.

Car park before resurfacing, potholes and bare ground
BEFORE
Car park levelled and resurfaced with fresh chippings
AFTER

CAR PARK REPAIR & RESURFACING

Potholes filled and levelled with road chippings — reopened to traffic the next day.

Fresh concrete slab poured outside industrial unit

CONCRETE SLABS & PADS

Shuttered, poured and finished — slabs, roadways and pathways cast in a single visit.

New steel gate post set in concrete

GATES, POSTS & FENCING

Entrance rebuilds — old fencing out, ground dug and filled, steel posts set in concrete.

Burnt and cracked double socket before replacement
BEFORE
New double socket fitted
AFTER

DAMAGED SOCKETS REPLACED

Burnt-out and cracked fittings swapped for new — faults traced, circuits checked and tested.

Warehouse fitted with new LED strip lights

WAREHOUSE LED LIGHTING

7×65W 8,400-lumen LED battens plus floodlights — a dark shed turned into a workable space.

Steel staircase mid-refurbishment
BEFORE
Staircase finished with boarding and under-stair storage
AFTER

STAIRCASE & MEZZANINE WORKS

Steel staircase re-treaded and boarded in, plasterboarding finished, under-stair space enclosed.

New handrails and treads fitted to unit staircase

HANDRAILS & TREADS

New balustrade and timber treads on a steel stringer — safe access to the mezzanine.

EcoTherm insulation boards fitted to unit ceiling

INSULATION & BOARDING

Rigid insulation cut, fitted and foil-taped — condensation stopped and heat kept in.

Shed re-roofed with new torched bitumen felt

FLAT ROOF RE-FELT

Old perished felt stripped, new bitumen torched on — leak fixed for good.

Cladding joint sealed and painted to stop roof leak

CLADDING & LEAK REPAIRS

Leak traced to a failed cladding joint — sealed, flashed and repainted at height.

Slate roof covered in moss and debris before cleaning
BEFORE
Slate roof cleaned, gutters cleared
AFTER

ROOF & GUTTER CLEANING

Moss and debris cleared from slates, gutters and valleys cleaned — water going where it should.

Unit entrance with freshly painted walls, floor and new fire doors

WALLS, CEILING & FLOOR PAINTED

Full repaint with primed and painted floor, new fire doors — a clean, professional entrance.

Bath with mouldy failed sealant before
BEFORE
Bath resealed and surround cleaned
AFTER

BATHROOM REFRESH

Mouldy silicone cut out and resealed, tiles cleaned, woodwork repainted — like new without a re-fit.

Storage containers before repainting
BEFORE
Storage containers repainted and numbered
AFTER

CONTAINERS REPAINTED & SIGNED

Storage container fleet rust-treated, repainted and clearly numbered.

Beach hut rebuilt and repainted in light blue

BEACH HUT REBUILD & REPAINT

Subfloor rebuilt, hut lifted and re-based, new locks — painted inside and out.

WHO YOU'RE DEALING WITH

ABOUT

For over five years we've been the hands-on maintenance team behind busy industrial estates, storage sites, offices, flats and restaurants across Colchester and Essex — the kind of sites where something needs fixing every single day, and it has to be done right the first time.

Everything on this page is our own work, photographed on our own jobs. No stock photos. Every job we do is documented before, during and after, so you always know exactly what was done and why.

  • One contractor for the whole job — no chasing three trades
  • Reliable on occupied sites: tenants, customers and trading hours respected
  • Honest reporting — if it needs a temporary fix now and a proper fix later, we tell you
  • Emergency call-outs for leaks, storm damage and flooding
Completed new-build unit Completed drainage and resurfacing

GOT A JOB THAT NEEDS DOING?

Send a photo of the problem and we'll come back with a straight answer and a price.